Linton Crystal Technologies is redesigning the layout of its U.S. headquarters to better fit the company’s current service and supply offerings. This includes making room in the space where CZ furnaces used for R&D are located. As a result, the KX320MCZ in the building is available to purchase, along with several key components. The following, worth more than $3M, is being sold as a package for $1.5M (or best offer):
- 4000 Gauss Superconducting Tesla Engineering Magnet and magnet power supply
- 2 Cryopumps – to chill the superconducting magnet
- Injet Power Supply 200kwMain/50kwBottom (50 Hz) – designed for European or Chinese standards
- 50/60Hz Power transformer (if needed to fit to U.S. standards)
- Chiller
- 2 - I series Edwards vacuum pumps for redundancy and seamless operation
- Dual filter cannisters
- Hydraulic pump – for moving and adjusting the magnet
- UPS
- Turbo Pump
- 32” hot zone graphite – 2 sets; one is semiconductor grade, the other is solar grade
- 11 - 32” crucibles
- Vacuum lid – for 32” crucible loading
- Shield lift cart
- Cathetometer
Specifications on the grower are available online.
Interested parties should contact Scott Blazey, director of operations, at sblazey@lintoncrystal.com or (585) 363-3032.